Flaming Machine Overhaul
The flaming machine was washed and disassembled, and its parts were then inspected. The original bridge was planed and reused after regulating the rollers and restoring the crown of the hydraulic drive motor. All of the gas and oxygen plenum chambers were replaced. The roller unit frame was entirely redone, replacing the rollers, pinions and bearings; we also changed the pinions' and chain's casings to guarantee a longer product life. The electrical panel was fixed up. Some casings were remade and the hydraulic control unit was overhauled. Lastly, the parts were painted and the machine was reassembled.